JANUARY - MARCH 2019
Work has started on construction of the first of the two rail tunnel boxes to be built under the heritage-listed Chief Post Office (CPO) building in lower Queen Street.
Work has started on construction of the first of the two rail tunnel boxes to be built under the heritage-listed Chief Post Office (CPO) building in lower Queen Street.
Work has started on construction of the first of the two rail tunnel boxes to be built under the heritage-listed Chief Post Office (CPO) building in lower Queen Street.
The break-out of the southern tunnel under Commercial Bay
Lower Queen Street trench: The break-out into the northern tunnel under Commercial Bay. We have also commenced the construction of the concrete LQS northern tunnel.
Northern tunnel beneath the CPO building: rebar installation for next floor slab concrete pour. Both tunnels are being constructed in five sections inside the building. This will be the second section to be poured
Looking out from inside northern tunnel. Excavation in LQS is now approx. 13m deep.
Southern tunnel beneath the CPO building: setting up for waterproofing to start next week. This is in preparation for new concrete tunnel floor construction.
Albert Street near Wyndham, 25 Feb 2019
Mt Eden stormwater pipe 26 Feb 2019
At Mt Eden, the caisson being sunk at Nikau St.
The CRL trench in Albert St 27 Feb 2019
Albert St trench 27 Feb 2019
Albert Street concrete pour, February 2019
Albert St trench 7 March 2019
Albert St trench 7 March 2019
Albert St trench 7 March 2019
Albert St trench 7 March 2019
Albert St trench 7 March 2019
Tunnel construction CPO and Lower Queen St March 2019
Tunnel construction CPO and Lower Queen St March 2019
Tunnel construction CPO and Lower Queen St March 2019
Tunnel construction CPO and Lower Queen St March 2019
Tunnel construction CPO and Lower Queen St March 2019
Tunnel construction CPO and Lower Queen St March 2019
Tunnel construction CPO and Lower Queen St March 2019