1
2
3
4
City Rail Link's C6 contract involves diverting a section of the existing Mt Eden stormwater pipe.
Jeffie, the tunnel boring machine, being used in the CRL C6 works
Mt Eden stormwater pipe 26 February 2019
At Mt Eden, the caisson being sunk at Nikau St.